Planning.

The optimal implementation of an event is always based on sound planning. Here, planning the rigging is a key factor, as other constructions frequently depend on the rigging for their timing.

In addition, all subsequent construction relies on the stability and load-carrying capacity of the overall system and the individual components used in the safety assessment of the rigging.

The key services in this area are:

  • Feasibility studies
  • CAD planning (2D and 3D)
  • Material planning
  • Calculating and monitoring the forces generated
  • Preparation of statics
  • Permit planning
  • Construction timelines (scheduling)